Screamin' Eagle
About
Challenges
Run a plunger successfully in a deep, deviated well
Plunger need to reach the well’s decline curve production forecast, without failing to run
Production was inconsistently running about 240 µcf/day and 120 BBL/day
Results
Gas production increased 180 µcf/day, which brought the well to 420 µcf/day total
Liquid production increased by 10 BBL/day, totaling to 130 BBL/day
This 75% increase in gas production led to more projects with the Screamin' Eagle plunger
Have a similar problem?
After using the Screamin' Eagle plunger, an operator reported an increase of 180 µcf/day. Liquid gas production increased by 75%.