Screamin' Eagle
About
Challenges
Performnce was below the well’s decline curve using a bypass plunger
The well was producing 864 µcf/day with a casing pressure at 730 PSI
The cycle times were consistently running around 25 minutes
Results
Increase of 184 µcf/day which brought the well to 1,048 µcf/day total and the casing pressure was reduced to 610 PSI
The plunger cycle times were reduced by 16%
The increase of gas production alone earned the operator around $11,000 more in 30 days
Have a similar problem?
The Screamin' Eagle cut cycle time by 16%, reduced pressure by 120 PSI, and increased production by 184 µcf/day.