top of page

Paraffin Control Plungers

About

Challenges

  • Needed an affordable and effective way to prevent paraffin buildup

  • Wells were not liquid loaded

Results

  • Saved thousands in hot oil tubing jobs

  • Reduced downtime

  • Prevented paraffin buildup in surface facilities

Have a similar problem?

Well Master utilizes styles with deep grooves to prevent paraffin build up, saving downtime and thousands of dollars in hot oil tubing jobs.

For more information about how Well Master can meet your needs, contact us today!

  • Instagram
  • Facebook
  • LinkedIn
  • YouTube
  • TikTok
Return to Home Page

US Corporate Office

+1 (303) 980-0254

info@wellmaster.com

16201 Table Mountain Pkwy Suite 100

Golden, CO 80403

Canada Corporate Office

+1 (780) 539-5037

WMCanada@wellmaster.com

102,11334 89 Avenue

Grande Prairie, AB T8V 5V8

© 2024 Well Master Corporation. All rights reserved.

bottom of page